FIFTH SLIDE:

1. The complete list of equipments and running our based Planned Maintenance System (PMS) to be prepared. All inclusive list for the Starting and Stopping instructions for machineries and equipments to be posted.

2. Equipment redundancy to be prepared and all standby machinery to have change over sequence. These are to be well defined and posted.

3. Critical spares to be listed as per machinery category and their criticality matrix.Minimum spares required for optimal running of plant to be kept on the platform with updated record of their consumption and use.

4. Standard PPE, Full sleeved coveralls with winter protection, Safety Harness with inertia reel latched at strong point in case of working at heights. Ear muffs/defenders for noisy ambient environment, gloves and hard hat and safety shoes with steel toes will be standard issue. Work vest and lifejackets to be available for operators and visitors.

5. Authorised personnel only areas to be clearly marked with visible signs.

6. Evacuation and extraction procedures and means of sending SOS in case of emergencies and the required training similar to BOSEIT and HUET to be provided.

7. Desalination Plant: The RO process has a high pressure stage from after the HP pump till the brine enters the Membrane stack. Extra clamping of pipes and hoses to be ensured. Transparent perspex shielding to be installed around the membrane stacks . This is to stop any high pressure burst hose spray reaching live electrical switch boards or operators.

8. High pressure Centrifugal pump with standard protective covers around rotating shafts and couplings to be provided. High pressure pipes to have secondary pipe in pipe design.

9. Standard Electrical safeties, insulated mats near witch boards, warning signs and posters showing High Voltage to be made visible and to be accessible to trained and authorised personnel and operators.

10. Platform gangway selection and accessibility and means of evacuation.