Tenement Block Case Study

The first case study was carried out on 8 household tenement blocks. These buildings are often old (pre-1919), and many are owned by Glasgow Housing Association for Social Housing.


Description of Current System

To create our case study we had to assume several parameters.

Description of upgrade

The Case study looked into the impact of changing to the new system:

Micro-CHP system in place

In the 8-household tenement block employing micro-CHP will be investigated. At 1kWe, WhisperGen is the smallest commercially available micro-CHP unit on the UK market. Around 80,000 of these units have been installed in the UK.

Performance Specification

Electrical Efficiency

Please goto here to download a copy of the spreadsheet and to see the calculation procedure in greater detail.

 

 

 