- Back to Case Study -

 

bg



High Appin

  • Location surrounded by commercial forestry.

  • A 3.7 kW hydraulic turbine has been installed for use with an existing stream.

  • Domestic residence is a traditional Scottish dwelling

  • Grid connection (Feed-in).

 

  MSc: Renewable Energy Systems and the Environment
© University of Strathclyde 2010