- Back to Case Study -

 

bg



Creetown

  • A couple building a traditional Swedish timber house in an exposed area close to commercial forestry.

  • They are planning the installation of a 0.5 kW hydraulic turbine.

  • A small dam using the water collected via road drainage is proposed.

 

  MSc: Renewable Energy Systems and the Environment
© University of Strathclyde 2010