By considering the given time frame, we were unable to complete all areas that we are like to do. So, there is a lot of opportunity to study further about this project. Some of the areas that we are identified is given as future work here.
Seawater pumped hydro model require more accurate measurements and calculations. Also, need to address challenges like installation and cost of construction for the seawater pumped hydro.
The project required to investigate the risks and possible environmental impact in the island.
The project requires to analysis on the available grants from the government to reduce capital investments.
Detailed economic analysis such as the maintenance and operating costs of seawater pumped hydro.
Better use of revenue from the grid sales for the community development.
Investigate more strategies to attract more tourists along with hydro and makes Cumbrae economy much stronger.
Address
Department of Mechanical & Aerospace Engineering, James Weir Building, Level 8, 75 Montrose Street
Glasgow G1 1XJ
Scotland, UK