Creetown - Renewables Potential
Specific Consideration
Hydro
- Glenquicken house (Creetown), plan to install a small scale hydro system of 0.5 kW using water from road drainage as the source.
- The design flow will be of 10 l/s (0.01 m3/s) and a head of 12 m.
- According to our estimations the maximum power output should be 0.6 k W.
- The estimated flow rate of the source is 10 l/s.
- A reservoir for 10 days storage is planned. This is estimated to increase the power output to 1 kW.
- The volume of the reservoir will be 10,000 m3.
|