  • Glenquicken house (Creetown), plan to install a small scale hydro system of 0.5 kW using water from road drainage as the source.

  • The design flow will be of 10 l/s (0.01 m3/s) and a head of 12 m.

  • According to our estimations the maximum power output should be 0.6 k W.

  • The estimated flow rate of the source is 10 l/s.

  • A reservoir for 10 days storage is planned. This is estimated to increase the power output to 1 kW.

  • The volume of the reservoir will be 10,000 m3.

 

 

 