This folder holds the model configuration

Mid_floor_sto_tpl.cfg has temporal casual gains in
several of the flats. Mid_floor_sto.cfg omitts the
temporal casual gains and uses scheduled occupancy
via zone operation files only.

The first 48 zones are for the building and the remaining
zones represent storage heaters (a core zone with heating
injected and an outer case).

A flow network is used to represent the operation of
the storage heaters (there is a top and bottom vent
in the case and the upper vent is controlled by time).
The flow network also represent facade leakage and flow
between rooms either via partially opened doors or
undercut door openings. There are small extracts in
the kitchen (these are controlled to be on if the room
goes over 22C. Bathroom vents run in the background.
The facade is somewhat leaky.

Simulation parameter sets have been defined for both
short assesments and two longer ones jan-end-of-april
and mid-september till end of year to represent times
when the storage heaters are active.

The extract.bash gathers a number of standard metrics.