case 630:

As for case 620 except that there are 2 overhangs - 1 in each window (west and
east).

Results (all energy in kWh)
-----------
timesteps    	 heating energy (hrs)   cooling energy(hrs)
------------------------------------------------
 4 ts/hour	  4782(4223)		 2785 (2180)


Results (all loads in kW)
-----------
timesteps       Peak heating load                Peak cooling load
---------------------------------------------------------------------------
 4 ts/hour	 3.61 (4 Jan@06h22)		 3.66 (26 Jul@15h22)


Diff 630-620
Date:		heating energy    cooling energy
------------------------------------------------
 28/7/04	  261		    -1015 
 DM (1993)	  437		    -1288
 

Diff 630-620
Date:	       Peak Heating          Peak cooling
--------------------------------------------------------
 28/7/04	  0     	 	 -0.46
 DM (1993)	  0.001			 -0.562



Diff 930-630
Date:		heating energy    cooling energy
------------------------------------------------
 28/7/04	-1082		    -1322 
 DM (1993)	 -907		    -1090
 

Diff 930-630
Date:	       Peak Heating          Peak cooling
--------------------------------------------------------
 28/7/04	 -0.27     	 	 -1.46
 DM (1993)	  0.237			 -1.199
