Week One (26/01/98 to 01/02/98)
Supervisory Details
Introductory meeting. Discussion on possible topics related to CHP for the project. The group presented two case studies where a feasibility study is required (Time Capsule Leisure Centre). The Supervisor mentioned the possibility of a feasibility study on a CHP plant for District Heating in Eaglesham. Suggestion of the resources available (ENTRACK) for gathering numerical data.
Work in Progress
Literature Review on CHP.
Preparation for the first crit.
Market Survey on current prices for CHP plants up to 1MWe.
Agenda for Coming Week
Visit to a CHP plant (Time Capsule).
Proceed with Literature Review.