For each option the optimum financial (payback) and energy (CO2) options were 
highlighted by   and   respectively.  
These optimums are then inserted in a chooser sheet for comparison & selection
               
j) electrical exporting (grid), low tariff off      
               
    payback (years) npv 15 (k£) CO2 saved (Tonnes) Utility saved (k£pa) Capital (k£) Capital per CO2 (k£/tonne)
  338 15.8 -349 536 76 922 1.72
  450 12.7 -224 653 99 966 1.48
  563 10.9 -111 749 120 1010 1.35
  619 10.4 -72 788 129 1032 1.31
  675 10.1 -44 820 137 1054 1.29
  731 10 -29 851 144 1076 1.26
  788 10 -30 882 149 1098 1.24
  844 10.1 -43 910 152 1119 1.23
  1125 12.1 -244 1024 157 1224 1.20
  1688 20.8 -761 1148 152 1425 1.24
  2250 51.2 -1307 1139 143 1613 1.42
               
k) electrical exporting (dist network), low tariff off    
               
    payback (years) npv 15 (k£) CO2 saved (Tonnes) Utility saved (k£pa) Capital (k£) Capital per CO2 (k£/tonne)
  338 15.6 -349 536 76 922 1.72
  450 12.6 -224 653 99 966 1.48
  563 10.9 -109 749 121 1010 1.35
  619 10.3 -60 788 131 1032 1.31
  675 9.9 -18 820 140 1054 1.29
  731 9.6 16 851 149 1076 1.26
  788 9.3 43 882 157 1098 1.24
  844 9.2 63 910 164 1119 1.23
  1125 9 94 1024 192 1224 1.20
  1688 9.2 86 1148 239 1425 1.24
  2250 9.4 47 1139 283 1613 1.42
               
l) electrical exporting (private wire), low tariff off    
               
  engine (kWe) payback (years) npv 15 (k£) CO2 saved (Tonnes) Utility saved (k£pa) Capital (k£) Capital per CO2 (k£/tonne)
  338 16.3 -389 536 76 962 1.79
  450 13.2 -264 653 99 1006 1.54
  563 11.3 -144 749 121 1050 1.40
  619 10.6 -87 788 132 1072 1.36
  675 10 -33 820 143 1094 1.33
  731 9.5 21 851 153 1115 1.31
  788 9.1 77 882 164 1137 1.29
  844 8.7 130 910 175 1159 1.27
  1125 7.4 392 1024 226 1264 1.23
  1688 6 893 1148 327 1465 1.28
  2250 5.3 1363 1139 422 1653 1.45
               
m) electrical exporting (private wire), low tariff on    
               
    payback (years) npv 15 (k£) CO2 saved (Tonnes) Utility saved (k£pa) Capital (k£) Capital per CO2 (k£/tonne)
  338 17.7 -433 672 78 962 1.43
  450 14.4 -328 800 101 1006 1.26
  563 12.2 -216 900 123 1050 1.17
  619 11.4 -160 939 134 1072 1.14
  675 10.8 -106 971 145 1094 1.13
  731 10.2 -52 1001 155 1115 1.11
  788 9.7 3 1033 166 1137 1.10
  844 9.3 56 1061 177 1159 1.09
  1125 7.8 319 1174 228 1264 1.08
  1688 6.2 820 1299 328 1465 1.13
  2250 5.4 1318 1238 424 1653 1.34
               
n) electrical exporting (private wire), low tariff on, 50% grant  
               
  engine (kWe) payback (years) npv 15 (k£) CO2 saved (Tonnes) Utility saved (k£pa) Capital (k£) Capital per CO2 (k£/tonne)
  338 8.8 48 672 78 481 0.72
  450 7.2 175 800 101 503 0.63
  563 6.1 309 900 123 525 0.58
  619 5.7 376 939 134 536 0.57
  675 5.4 440 971 145 547 0.56
  731 5.1 505 1001 155 558 0.56
  788 4.8 572 1033 166 569 0.55
  844 4.6 636 1061 177 580 0.55
  1125 3.9 951 1174 228 632 0.54
  1688 3.1 1552 1299 328 733 0.56
  2250 2.7 2144 1238 424 827 0.67