| Results
  summary |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Lowest
  tonnage input and biogas yield estimate, Middle tonnage and biogas yield
  estimate, Highest tonnage and biogas yield estimate |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | The Lowest,
  middle and high values are defined by the entries on the FeedStockProperties
  sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Input feed properties |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  | Estimates |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  | Lowest | Middle | Highest | (Biomass) |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Lorry loads of delivery
  each day | 8.2 | 12.3 | 17.6 | lorries/day |  |  | from FeedTransportCosts sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Total
  tonnes per day | 116.4 | 176.2 | 251.8 | tonnes/day |  |  | from InputFeedMix sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Dry
  solids content range of feed | 9.2% | 11.9% | 14.6% | % |  |  | from InputFeedMix sheet. This should be
  between 6-15%. If too low, remove water or add dryer feed. If too high, add
  water. |  |  |  |  |  | 
 
  | Total
  dry solids per day | 10.68 | 21.00 | 36.80 | tonnes/day |  |  | from InputFeedMix sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | VS
  content of dry solids | 75.7% | 75.2% | 74.8% | % |  |  | from InputFeedMix sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Total
  volatile solids per day | 8.09 | 15.79 | 27.53 | tonnes/day |  |  | from InputFeedMix sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Volatile
  solids loading rate | 3.43 | 4.43 | 5.40 | kg/m^3/day |  |  | from InputFeedMix sheet. This can be up to
  about 6-7 for a single stage, and 25-50 for a two-stage
  acidogenesis+methanogenesis system |  |  |  |  | 
 
  | Carbon:Nitrogen
  ratio | 22.1 | 20.0 | 18.6 |  |  |  | from CarbonNitrogen sheet. This should be
  between 20 and 30, optimum 25. Add Paper/sawdust to increase, blood or slurry
  to decrease |  |  |  |  | 
 
  |  |  |  |  |  |  |  | If Carbon/Nitrogen ratio is not in the 20-30
  target range, biogas yields will be reduced |  |  |  |  |  |  |  |  |  | 
 
  | HRT and SRT |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Two stage
  process ? |  | NO |  |  |  |  | from BiogasYields sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | HRT, 1st
  phase |  | 20 |  |  |  |  | from ParametersPlant sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | HRT, 2nd
  phase |  | NA |  |  |  |  | from ParametersPlant sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | SRT,
  1st phase |  | 20 |  |  |  |  | from BiogasYields sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | SRT,
  2nd phase |  | NA |  |  |  |  | from BiogasYields sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | SRT
  ratio 2nd phase/1st phase |  | NA |  |  |  |  | 5-15 for a two-stage process |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Digester properties |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Input buffer diameter | 8.29 | 9.52 | 10.72 | m |  |  | from DigesterSizing sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Input
  buffer height | 8.29 | 9.52 | 10.72 | m |  |  | from DigesterSizing sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Pasteuriser
  diameter (each) | 1.53 | 1.76 | 1.98 | m |  |  | from DigesterSizing sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Pasteuriser
  height (each) | 1.53 | 1.76 | 1.98 | m |  |  | from DigesterSizing sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | 1st
  stage diameter (each) | 11.45 | 13.14 | 14.81 | m |  |  | from DigesterSizing sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | 1st
  stage height (each) | 11.45 | 13.14 | 14.81 | m |  |  | from DigesterSizing sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | 2nd
  stage diameter (each) | NA | NA | NA | m |  |  | from DigesterSizing sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | 2nd
  stage height (each) | NA | NA | NA | m |  |  | from DigesterSizing sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Digestate
  buffer diameter | 14.00 | 15.98 | 17.90 | m |  |  | from DigesterSizing sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Digestate
  buffer height | 14.00 | 15.98 | 17.90 | m |  |  | from DigesterSizing sheet |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Temperatures |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Pasteuriser | 70.9 | 70.9 | 70.9 | C |  |  | from ThermalBalance sheet |  |  | 
 
  | 1st
  stage digester | 38.0 | 38.0 | 38.0 | C |  |  | from ThermalBalance sheet |  |  | 
 
  | 2nd
  stage digester | NA | NA | NA | C |  |  | from ThermalBalance sheet |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Process problems
  affecting biogas yields |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Approximate biogas yield
  (relative to baseline) due to inadequate SRT |  | 93% |  |  |  |  | from BiogasYields sheet |  |  | 
 
  | Approximate
  biogas yield (relative to baseline) due to imperfect C:N ratio | 146% | 139% | 133% |  |  |  | from BiogasYields sheet |  |  | 
 
  | Approximate biogas yield
  (relative to baseline) due to temperature excursions | 100% | 100% | 100% |  |  |  | from BiogasYields sheet |  |  | 
 
  | Approximate biogas yield
  (relative to baseline) due to all above factors | 136% | 129% | 123% |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Biogas/methane power
  outputs |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Total biogas per day | 4015.86 | 6866.41 | 11987.92 | m^3 |  |  | from BiogasYields sheet |  |  | 
 
  | Average biogas per tonne
  feed input (including water) | 34.5 | 39.0 | 47.6 | m^3/tonne |  |  | from BiogasYields sheet |  |  | 
 
  | Average
  biogas per tonne feed input (excluding water) | 34.5 | 39.0 | 47.6 | m^3/tonne |  |  | from BiogasYields sheet |  |  | 
 
  | Methane
  content range of biogas | 51% | 58% | 67% | % |  |  | from BiogasYields sheet |  |  | 
 
  | Total
  methane per day | 2045.11 | 3989.62 | 8058.59 | m^3 |  |  | from BiogasYields sheet |  |  | 
 
  | kWh per
  day @ 11.04 kWh/m^3 | 22577.98 | 44045.43 | 88966.85 | kWh/day |  |  | from BiogasYields sheet |  |  | 
 
  | kW
  average power (methane) | 940.75 | 1835.23 | 3706.95 | kW |  |  | from BiogasYields sheet |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Energy |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Total methane energy
  yielded, of which | 940.7 | 1835.2 | 3707.0 | kW |  |  | from BiogasYields sheet |  |  | 
 
  | Engine heat lost | 96.8 | 165.2 | 333.6 | kW |  |  | from EngineSize sheet |  |  | 
 
  | Generator
  heat lost | 15.7 | 31.2 | 63.0 | kW |  |  | from EngineSize sheet |  |  | 
 
  | Process heat required | 81.1 | 116.7 | 160.4 | kW |  |  | from ThermalBalance sheet |  |  | 
 
  | Process
  electrical required | 31.5 | 48.2 | 70.7 | kW |  |  | from ElectricalLoads sheet |  |  | 
 
  | Surplus
  electricity for export (import if negative) | 266.1 | 544.5 | 1126.7 | kW |  |  | from ElectricalLoads sheet |  |  | 
 
  | Surplus
  heat (available for CHP export) | 449.7 | 929.4 | 1952.6 | kW |  |  | from ThermalBalance sheet |  |  | 
 
  | Check energy sum | 940.7 | 1835.2 | 3707.0 | kW |  |  | Sum energy breakdown to check consistency |  | 
 
  | Surplus CHP water
  temperature | 73 | 76 | 79 | C |  |  | from ThermalBalance sheet |  | 
 
  | Surplus
  CHP water at mass flow rate | 1.65 | 3.26 | 6.58 | kg/s |  |  | from ThermalBalance sheet |  | 
 
  | Surplus
  CHP water must be returned at or above above |  | 8 |  | C |  |  | from ParametersEngine sheet |  | 
 
  | Efficiency of
  electrical export, as a proportion of methane energy | 28% | 30% | 30% |  |  |  |  |  |  |  | 
 
  | Potential
  total efficiency of electrical plus CHP energy | 76% | 80% | 83% |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  | Profitability
  index calculation, NPV using primary discount rate figure, for the 10-year
  investment |  |  |  |  |  |  |  |  | 
 
  | Plant capital cost | £3,967 | £5,042 | £6,314 | £1000s |  |  |  |  |  |  | 
 
  | Invested
  capital amount (minus grant) | £2,777 | £3,529 | £4,419 | £1000s |  |  |  |  |  |  | 
 
  | Total
  net present value of project at primary discount rate | -£4,982 | -£4,676 | -£3,847 | £1000s |  |  |  |  |  |  | 
 
  | Profitability
  index (=NPV/Capital investment) | -1.79 | -1.32 | -0.87 |  |  |  |  |  |  |  | 
 
  | Internal
  rate of return (IRR) | 43.9% | 72.8% | -98.8% |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |   |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | 
 
 
  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |