Project Log

 

Week 1

 

·       Introduction to group members.

·       Met with industrial contact - Department of Architecture (University of Strathclyde).

·       Rottenrow Site under consideration for case study.

 

Week 2

 

·       Review of possible energy efficient technologies for use in case study.

·       Decision to go ahead with supply/demand matching at Rottenrow site (using Merit).

·       Decision to go ahead with thermal modelling of Rottenrow site (using ESP-r).

·       First Critical Review.

·       Start made on Web-Page Development.

 

Week 3

 

·       Following Critical Review advised to investigate Case Studies of existing Zero/Low emissions buildings to fully appreciate the current state of the art.

·       Case Studies to be reviewed identified.

·       Case studies delegated to group members.

·       Second Critical Review.

·        Web Page updated. 

 

Week 4

 

·       Reviewed Sick Building Syndrome.

·       Defined the direction of our Project which is to develop a methodology for selecting technologies to incorporate within building design.

·       During a brainstorming session developed our methodology for the selection of technologies/materials by outlining a selection criteria.

·        Responsibilities within group delegated.

·       Web Page updated. 

 

Week 5

 

·       Reviewed the common practice Building Design Process.

·       Discovered no methodology currently existing for selection of technologies/materials for use within buildings which strengthened our case for developing a selection criteria.

·       Selection criteria for selection of materials/technologies under further development.

·         ESP-r Modelling of Rottenrow Site commenced.

·       Preparation of information for third Critical Review.

·       Web Page updated. 

 

 Week 6

 

·       Initial study of lifecycle analysis undertaken.

·       Selection criteria for selection of materials/technologies under further development.

·       ESP-r modelling continuing.

·       Third Critical Review.

·       Web Page updated. 

 

Week 7

 

·       Abandoned high level selection tool as was impractical due to high degree of complexity.

·       Altered strategy to developing a more comprehensive reference type selection tool.

·       ESP-r construction model completed. Building Electrical and Heating demands calculated on paper.

·       Web Page updated. 

 

Week 8

 

·       Supply/Demand matching on Merit commenced.

·       Reference tool being updated with information.

·       Visited HLM architects to gain industrial perspective on selection tool.

·       Web Page Updated.

·       Fourth Critical Review.

 

Week 9

 

·       Reference tool near completion.

·       Merit Supply/Demand matching near completion.

·       ESP-r model attributed for simulation.

·       On going work on selection tool.

 

Week 10

 

·         Supply/Demand Matching completed.

·         ESP-r simulations underway.

·         Preparation for final presentation underway.

·         Web Page updated.

 

Week 11

 

·         ESP-r Simulation complete.

·         Quantatative Analysis.

·         On-going work on final presentation and web Page.

 

Week 12

 

·         Web Page Completed.

·         Preparations for final presentation.