Case Studies - Building Modelling


Daylight Utilization in Commercial Building



Specification of theThermal Zones - Victoria Quay

Zone

Volume (m3)

Floor area m2

Description

plenum

229.5

382.0

raised floor at 2nd level

low_a

100.8

63.0

occupied space at west part of 2nd level

low_b

75.6

47.3

occupied space at 2nd part of 2nd level

low_c

100.8

63.0

occupied space at middle of 2nd level

low_d

151.2

94.5

occupied space at east of 2nd level

conf

163.2

47.2

conference and miscelaneous facing atrium

friel

43.2

27.1

lower part of supervisors offices facing atrium

u_friel

49.9

27.1

upper part of supervisors offices facing atrium

upper

495.3

267.7

upper part of low_a,low_b,low_c,low_d

plenum 3

229.5

311.6

raised floor at 3th level

floor_3

498.6

311.6

lower (occupied) portion of 3rd level

floor_3up

451.8

311.6

upper part of 3rd level

atrium

4446.0

292.5

lower portion of the atrium

atrium_up

2120,61

292.5

upper portion of the atrium


Example of the Operation Schedules for one thermal zone

Building operation weekday schedule
other heat gains

Time

Lights

Occup

Casual

Other

0-1

1-2

2-3

3-4

4-5

5-6

6-7

7-8

8-9

9-10

10-11

11-12

12-13

13-14

14-15

15-16

16-17

17-18

18-19

19-20

20-21

21-22

22-23

23-24

= 0% = 25% = 50% =100% of max.gain