Some of the 33 generated and evaluated energy conservation measures
Replacement of the existing windows by aluminum framed double glassed ones
Installation of automatic controlled entrance doors
Reconstruction of the existing heating systems and zoning
Replacement of the existing air-conditioning system in the surgery
Implementation of automatic control in the DHW subsystems
Replacement of the burner’s nozzles
Reducing the steam pressure by steam pressure reduction valve
Installation of steam traps
Implementation of automatic control for boiler’s blowdown process
Insulation of the pipes in the heavy oil preheating subsystem
Condensate heat utilisation for cold water preheating in the laundry
Installation of low-flow shower heads and flow restrictors in faucets
Installation of two water flow meters in the DHW subsystems
Installation of three tariff electricity meter
Replacement of the incandescent lamps with high effective ones
Implementation of automatic lighting control system
Variable speed drive for boiler’s fan