OFFSHORE DEEP WATER SUBSTATION FEASIBILITY STUDY

        Home Introduction Objective Methodology Results Conclusions The Team
 
 
 
 
 
 

ASSESSMENT CRITERIA DISCUSSION - FABRICATION

 
 

REFERENCES

TECHNIP- COFLEXIP. (2003). Spar Overview. Available: http://www.offshore-mag.com/articles/print/volume-73/issue-02/engineering-construction-installation/finland-yard-

maintains-leadership-in-gom-spar-hulls.html . Last accessed 17th April 2014.

Oil and Gas UK. (2011). Economic Report 2011 Available: http://www.oilandgasuk.co.uk/economic_report/focus_on_fabrication.cfm.  Last accessed 21th April 2014.

America Petroleum Institute. (MARCH 2001). Recommended Practice for Planning, Designing, and Constructing Floating Production Systems. Available: http://

www.offshoremoorings.org/moorings/PDF/API%20RP%202FPS%2001%20-%20Planning%20Designing%20and%20Constructing%20Floating%20Production

%20Systems.pdf.  Last accessed 18th April 2014.

Øyvind Selnes Patricksson. (2012). Semi-Submersible Platform Design to Meet Uncertainty in Future Operating Scenarios. Available: http://www.diva-portal.org/smash/

get/diva2:566081/FULLTEXT01.pdf.  Last accessed 19th April 2014.

Oil and gas journal. (1995). SHELL MARKS PROGRESS IN DEEPWATER GULF. Available: http://www.ogj.com/articles/print/volume-93/issue-46/in-this-issue/drilling/

shell-marks-progress-in-deepwater-gulf.html.  Last accessed 19th April 2014.

SSK, 1976-1990. Indigenous Submarine Construction The SSK Project. [Online] Available at: http://www.irfc-nausena.nic.in/irfc/ezine/trans2emins/12_ssk_project.htm 

#Submarine Construction Schedule [Accessed 26th April 2014].