Measurement & Control System based on the LabView software.

 

1. Purpose of the programme

The reason that we constructed a measurement and control programme is that we want to use this programme for matching and dispatching the power produced from the distributed renewable stations connected to a distribution network, and also the power from a large-scale power station and the power from the main electrical grid, which are connected to the transmission substation.

Furthermore, a basic purpose, which is satisfied using this programme, is the success of a high security level in the distributed generation.


2. Why measurement & control system?

The system that we have developed is called measurement,because it permits the measurement of some quantities (e.g. the Maximum, Minimum and the Average value of the power consumed from a distribution network).

And it is also called the control system, because it controls if the demand of the distribution network can be satisfied from the power of the embedded stations,or if there is need for the the grid to complement the final power supply.
Additionally, the programme controls the quantities of power that supplied.