Measurement & Control System based on the LabView software.
1. Purpose of the programme The reason that we constructed a measurement and control programme is that we want to use this programme for matching and dispatching the power produced from the distributed renewable stations connected to a distribution network, and also the power from a large-scale power station and the power from the main electrical grid, which are connected to the transmission substation. Furthermore, a basic
purpose, which is satisfied using this programme, is the success of a
high security level in the distributed generation.
The system that we have developed is called measurement,because it permits the measurement of some quantities (e.g. the Maximum, Minimum and the Average value of the power consumed from a distribution network). And it is also called
the control system, because it controls if the demand of the distribution
network can be satisfied from the power of the embedded stations,or if
there is need for the the grid to complement the final power supply. Back to home page |