Table 4.1

No

 

ECM

TOTAL

Analysis

Existing

E C M

Savings

%

Costs

Savings

SPB

MWh

MWh

MWh

$

$/year

years

B1

Window retrofit

1714.14

1338.14

376.30

21.95

23300

8775

2.66

B2

Replacement of wooden framed windows by double glassed aluminium framed

1714.14

1416.97

296.88

17.32

226000

6923

32.64

C1

Automatic control of the heating system

1470.31

1018.99

451.03

30.68

6347

10518

0.60

B3

Installation of an additional door at the main entrance

583.20

580.56

2.64

0.45

B4

Insulation of the Director's office floor

354.90

354.02

0.88

0.25

B5

Weatherisation of the doors in blocks 2and 5

354.90

353.73

1.17

0.33

B6

Weatherisation of the doors in block 4

532.21

531.91

0.29

0.06

C2

Installation of low flow shower heads

532.21

457.48

74.73

14.04

225

1743

0.13

C3

Retrofit of the ventilating system in the swimming pool

177.00

66.81

110.19

62.25

5901

2570

2.3*

TOTAL

Analysis

Existing

E C M

Savings

%

Costs

Savings

SPB

MWh

MWh

MWh

$

$/year

years

E1

Replacement of lamps by more effective

183.67

97.95

12.66

10

3536

671

5.26